Categories

Archives

Deck Organizers

I finally got the deck organizers installed on Sea Puppy.
Here are a few pictures of them with the lines run.

18378

18384

18393

this picture is of how I have run stuff through blocks at the base of the mast forward to the organizer… the block on the port side of the mast that is not in use will be used for the cuningham and there will be another in the same location on the starboard side of the mast for the topping lift. It isn’t installed yet. have to wait till I get the mast down to get the cheek block installed at the mast head and the entrance and exit plates installed to run the line internally.

18387